We've talked plumbing before.... anyhow, I tore out my bathroom.
Took out floor & joist (was standing on dirt).
Took out ceiling (blown in insulation and all).
Stripped walls to studs...
Tore it ALL out.
Put in new joist, subfloor, backerboard, framed in ceiling, added new light/fan and duct work, new insulation.
put in new 4 pc tub, new faucet, new drain line.
New electrical, plugs, switches.
New sheet rock on walls & ceiling (2 vapor barriers in ceiling).
Putty, sanded, painted....
Done it all myself, with a little help from my 3 sons, as they could spare a moment (which wasn't much, since they have their own families)...
Still have the other side of the batroom to finish - but 3/4ths is done now.
So far, about $3,500 invested vs $10-15K to a contractor (or more).
Still more to do, but it's taking shape.
T.
Took out floor & joist (was standing on dirt).
Took out ceiling (blown in insulation and all).
Stripped walls to studs...
Tore it ALL out.
Put in new joist, subfloor, backerboard, framed in ceiling, added new light/fan and duct work, new insulation.
put in new 4 pc tub, new faucet, new drain line.
New electrical, plugs, switches.
New sheet rock on walls & ceiling (2 vapor barriers in ceiling).
Putty, sanded, painted....
Done it all myself, with a little help from my 3 sons, as they could spare a moment (which wasn't much, since they have their own families)...
Still have the other side of the batroom to finish - but 3/4ths is done now.
So far, about $3,500 invested vs $10-15K to a contractor (or more).
Still more to do, but it's taking shape.